Rapidwall Responds to Devastating Victorian fires

on .

Rapidwall Responds to Devastating Victorian fires

Rapidwall's manufacturing facilty at Kilmore in Victoria was right there at the fire front.

Rapidwall is ideally suited for rapid deployment in the reconstruction of houses destroyed by fire and where the ground concrete slabs remain intact.

It is possible to manufacture and cut panels for two houses per day to meet demand.

Due to this, once the debris is cleared from the existing house slab, new panels can be installed within days (average house takes 1 day for wall panel installation), new trusses and roof installed with windows/doors and therefore a lock up weather proof structure can be in place within weeks and all to the layout of the old house.

Download the full Report